On its crawl up the Raccoon Mountain grade in Haletown, TN (MP J-133.1 Haletown), CSX Z345-23 (NS 734) (Memphis,TN/BNSF-Juliette,GA/NS) with a faded 19 year old BNSF SD70MAC in charge with a new generation CitiRail motor behind the lead motors, and with the two rear motor as DPU move the 145 car loaded Plant Scherer coal bucket up and over the six mile long grade heading to Chattanooga for the NS than on to Juliette, GA where the train will dump the low-sulfur coal at on of the largest power plants in the U.S. Georgia Power Plant Scherer, then shoot back to Memphis, TN to the BNSF in 72 hours.