Thirty minutes after cleaning snow off the 7591, one can hardly tell its been done as The Bloomer Shippers Line Railroad uses two Geeps to plow out the entire railroad Friday. Engineer Paul Jones ... (more)
The Bloomer Shippers Line Railroad used two Geeps to plow out the entire railroad Friday. Former Northern Pacific 7591, the Bloomer's first loco, gets some attention as trackworkers use scoop shov... (more)
The winter of 2009/2010 was hard on Washington DC with two major Blizzards. Displaced equipment sits on the lower level platforms covered in a thick blanket of snow and ice while track crews work... (more)
The winter of 2009/2010 was hard on Washington DC with two major Blizzards. P42 20 is coupled back-to-back with another P42 going throughout Washington Terminal to keep tracks clear as the relent... (more)