Interesting operation here. The mainline goes through the shed. Here this westbound just stopped for the conductor to line the siding switch to the main after the eastbound HWSA cleared.
A trio of Indiana Railroad SD9043MACs ease their train over the massive Tulip Viaduct in scenic southern Indiana. The bridge is 2,295 feet in length and 157 feet high. Construction concluded on th... (more)