The southbound Cedar River passes the depot at Osage where the headquarters of the Cedar River is. This crew goes to work here 5 days a week and drives to where the train is or to Waterloo. Today ... (more)
The Cedar River hasnt been up the line all the way to Glenville for about 6 days due to the schedule and Christmas. There isnt alot of snow in southern Minnesota but one drift has alittle snow in ... (more)
The Cedar River local heads back south towards Waterloo with 12 cars out of Glenville, MN. This job has just pasted thru London, MN in far southern Minnesota. This job will cross back into Iowa in... (more)
In a pretty rare event, a meet at Lyle with the Cedar River and the IC&E Snow Plow Job. The IC&E conductor watches as the CN local crosses thru the junction with the IC&E's Owatonna Sub. A diamond... (more)