Still quite new, CN ES44ACs 2808 and 2803 hustle a loaded coal train through Pedley.
CN 2967 climbs into Jasper with 152 coal loads in tow.
Brand new CN ES44ACs 2808 and 2803 speed downhill through Pedley, AB at 50+ mph.
CN ES44ACs 2808 and 2803 grind their way west about to depart the north track at Galloway with a loaded coal train.
After meeting Q102 at Galloway, C767 resumes it's climb to the Obed Summit on the Edson Sub.
A pair of CN's new AC powered GEVOs struggle up one of the steepest hills on the Edson Sub with a 174 carloads of coal.
Brand new CN ES44ACs 2808 and 2803 speed past the signal at Pedley East with a loaded Prince Rupert bound coal train.