The 2nd Watson yard job arrives in Torrance to begin their work on a hot Friday afternoon.
A short 2nd Watson heads down the Harbor Sub bound for Torrance.
A rebuilt GP60M leads the evening local into Torrance with a decent sized train.
The 2nd Watson heads down the Harbor Sub with a GP60 trio as they head out of Carson and under the I-110 Freeway.