Winding its way through an S curve at Bringo, P2508, P2502 & P2506 roll towards Geraldton Port with 3721 loaded iron ore from Perenjori.
A loaded iron ore train climbs the bank up through Pintharuka having finally recommenced its journey after earlier failing at Bell during its climb out of Morawa. All four Ps, P2508, P2506, P2505 ... (more)