Testrun of the "crocodile" Ce 6/8 II # 14253 of SBB Historic, built in 1919 by SLM and MFO, between Wassen and Göschenen on the Gotthard north ramp, leaving the 78 meter long Meienkreuz tunnel. T... (more)