With their trip down the Feather River Canyon complete, the crew of the LRR65-22 is almost done for the day as they move their train's power back toward their parking spot adjacent to the Oroville... (more)
Dropping downgrade through James, UP 9926 brings the LRR65 around the second half of the horseshoe curve here with the upper section seen up to the right.
UP 9926 finds the morning light in the depths of the Feather River Canyon for the first time today as it leaves the Honeymoon Tunnels behind and passes the Rock Creek Dam - a popular focus point f... (more)
With the iconic bridge over Lake Oroville behind it, UP 9926 leads the lake's namesake local into James on a wonderfully clear afternoon on the southern portion of the Feather River Canyon route.
Rolling across the upper bridge at Tobin, UP 9926 enters sunlight once more after a fairly dark trip down the northern half of the Feather River Canyon in the early morning hours.
Crossing Lake Oroville in the warm, afternoon sunlight, UP 9926 leads a local into James as it exists the iconic 1962-built bridge.
With its morning trip home almost complete, UP's LRR65 drops downgrade past the Thermalito Diversion Dam and Powerplant as it passes some fall foliage while skirting the Feather River just east of... (more)
SD59M-2 9926 and SD60M 2502 work transfer in Oroville.
Union Pacific 9926 leads the northbound Redding Turn out of Chico, California as a snow capped Mount Lassen looms in the distance.