A couple of UP unit's lead 213 through Cramertion right before a big storm blew through.
UP 5427 (ES44AC) has just run through the Rocky Mountains via the Moffat Tunnel Sub as part of a trio of helper engines sandwiched between two cuts of coal cars. They have separated and will head ... (more)
The night before the historic move of UP 4014 from Pomona to West Colton, the departure yard at West Colton was quite active with normal operations.
As the sun rises, a UP manifest is about to enter the BNSF Needles Sub for its trackage rights journey west towards West Colton, CA on 3/7/13. 2 UP SD60M's would be the rear end helpers on this tr... (more)
Northbound Detour
A detouring manifest waits for Amtrak to clear, before heading north.
A southbound Union Pacific freight tiptoes through the construction zone for the Colton crossing flyover in March, 2012. Much progress has been made since this photo was taken, including most of ... (more)
A trio of GE's lead an eastbound reefer train under the old Lincoln Highway bridge.
UP's Los Angeles to Lathrop intermodal passes under the high-wide detector at MP 363.8 on the number #2 main as it passes through Tehachapi Summit.
Southbound MRVWCB works up the #2 track at Caliente where a hot BNSF intermodal will over take them on the #1 main.
UP 5427 DPU pushes a 40 car mech-refer unit train around Cape Horn, milepost 144.75