Eastbound GO train at Burloak.
Doing no less than 30 MPH coming out the new flyunder, GO trains no longer have to wait for those lumbering freight trains to go crawling by.
A worker climbs aboard GO 613 as the trainset is serviced between runs.
Braving the blizzard like weather condtions on the Kennedy road bridge to catch some trains, GO 218 is seconds away from its arrival at Scarborough GO station.