SD30C-ECOs 5004 and 5018 approach Westside Rd as they lead the northbound wayfreight through Spillimacheen.
Lurking beneath the rugged geology lining the Thompson River Canyon near Ashcroft, British Columbia, Canadian Pacific’s Ashcroft local switches the tie plant east of town on the morning of Septe... (more)
Before entering St. Luc Yard this eastbound freight is crossing over from the eastward main track to enter the Lachine Piggyback Terminal to make a setoff. The Signals Department has some work to... (more)
As all trains were required to do, the crew of this westbound has completed its standing inspection and soon will depart St. Clet.
.
Canadian Pacific’s Ashcroft local switches the tie plant east of town on the morning of September 28, 2015. The facility occupies a piece of land wedged between the CP main line and the Thompson... (more)
The day gets started at Ashcroft, BC for CP's local crew. They will do some switching here in the yard before heading east to switch industries east of town. No more are the days of SD40-2s in act... (more)
Making it's way down 2nd ST
Diverging onto track one for a meet with a dimensional train, a rebuilt SD30C-ECO leads a London built SD70ACe on train 147.