Yet another detour Despite the blockades on the Kingston Sub being lifted CN is still running detours the long way around. Pure speculation on my part but my thinking is there's so much... (more)
CN eastbound with ES44AC 2808, ET44AC 3118
Still quite new, CN ES44ACs 2808 and 2803 hustle a loaded coal train through Pedley.
CN ES44AC 2808 struggles towards Jasper with 150 coal loads in tow. Sister 2806 was shoving on the tail end, operating at 0.41 horsepower per ton (HPT).
CN ES44AC 2808 crawls towards a crew change at Jasper with 149 loads of coal in tow. Another ES44AC, 2858 was helping on the tailend, but at 0.45 HPT (Horsepower per ton), this train wasn't settin... (more)
Brand new CN ES44ACs 2808 and 2803 speed downhill through Pedley, AB at 50+ mph.
CN ES44ACs 2808 and 2803 grind their way west about to depart the north track at Galloway with a loaded coal train.
After meeting Q102 at Galloway, C767 resumes it's climb to the Obed Summit on the Edson Sub.
A pair of CN's new AC powered GEVOs struggle up one of the steepest hills on the Edson Sub with a 174 carloads of coal.
Brand new CN ES44ACs 2808 and 2803 speed past the signal at Pedley East with a loaded Prince Rupert bound coal train.