On my way to work on November 18, 2009, the dispatcher calls to inform me I72 left a track indication between Attica and Marshfield. After obtaining Track Authority, I put my hyrail truck on the ... (more)
After a overnight snow fall, most of the snow at Edmonds have melted with some of the snow still hanging on from a distance in Mukilteo. The wind really started to pick up with winds sustained up ... (more)
Between the 450 m long Wiesen I tunnel and the 969 m long Bärentritt tunnel on the line from Filisur to Davos, there is a gap of only few more then 10 meter, where the passengers have a glimps of... (more)