Empty tank train with the multisystem locomotive Re 475 901 on the Bözberg north ramp. The locomotive was delivered new from Siemens Mobility to WRS in December 2020.
SBB Cargo International light engine move with the 2016 built multisystem locomotive 193 257. The locomotive is leased from ELL (European Locomotive Leasing).