Bringing up the rear of a southbound Union Railroad loaded ore train is URR caboose number 101 at milepost 2 along the North Bessemer Branch in Penn Hills, PA.
Two 38s and a Tunnelmotor prepare to depart North Bessemer as a light engine move.
A pair of B&LE SD40T-3's idle at XB!
Number 900 has tied onto his train and will soon be pulling a northbound freight from North Bessemer.
908 backs through North Bessemer to couple up with his northbound train.
A trio of B&LE Tunnelmotors pauses after cutting away from the CN ore train for the URR.
A UP yard engine testing at North Bessemer Yard.
Three tunnelmotors lug a loaded ore train into North Bessemer where it will be interchanged to the Union Railroad.
Note the piece of wood under the wheel keeping the loco from rolling through the yard.
A trio of B&LE SD40T-3's preparing to depart with a short MISC. train for Butler.
A trio of B&LE SD40T-3's working at a snowy North Bessemer Yard.