ACWR 200 crosses the Pee Dee River with the Tillery Hydroelectric Power Plant in the background.
An ACWR local prepares to pull from Mt. Gilead for Star with a pair of SD40s leading 41 cars.
Riding the Rails. The ACWR's F9A-B set leads a set of passenger cars from Candor to Charlotte.
Bridging the River. The ACWR passenger train movement pauses on the bridge at the Yadkin-Pee Dee Hydro Project.
Moving South. The ACWR passenger train movement heads past the Unilin facility at Mt. Gilead on its way to Charlotte, NC.
Resting on the Bridge. The ACWR ran its beautiful cab diesels and its passenger cars from Candor to Charlotte today and nicely let people know ahead of time, published a schedule, and stop... (more)
With the Tillery Hydroelectric Power Plant providing a backdrop, a pair of SD40s cross the Pee Dee River in the late afternoon.
The 300 job crosses the Pee Dee River on their return trip westbound.
The 300 job heads over the Pee Dee River between Mt. Gilead and Norwood with a couple SD40 rebuilds for power in the late evening.