The conductor on Q216 gives a big wave as a B36-7 and two leased (ex-BN) SD40-2's lead Q276 east over the ex-B&O P&W Subdivision.
A pair of UP diesels split the B&O signals at Callery as they climb the former B&O grade to Bakerstown.
With empty hoppers picked up at Evans City, PA in tow, Allegheny Valley Railroad 3003 heads eastbound on the Buffalo & Pittsburgh portion of this line.
Buffalo and Pittsburgh 887 makes its way home after an afternoon of switching.
BP 1506 leads the PW-1 on a rare daylight run through Callery Pa. NCIR 4302 is an unexpected visitor that was brought up by the BTNC from New Castle to get some work done in the Butler yard engine... (more)
The first train on the P&W after the snow fall.