Posted by Tom on December 4, 2012 | |
My congratulations to the folks doing this rebuild. Nothing like that within a 100 miles of here. Not all fun, no doubt, but so worthwhile and enduring.
|
I think I notice hydraulic jacks which must be used for the heavy lifting, since there is no crane runway for an overhead crane.
|
They're electric screw jacks, and not hydraulic. There are four of them that lifted the locomotive when it was time to set the drivers in place - two of which are visible in this photo.
|
|