Posted by on January 5, 2011 | |
Ah, you beat me too it Chris. Really just shows how ratty the trackage is there!
|
Just ahead of the train there is a drainage run off, the tracks got washed out pretty bad and there is a small bridge right ahead of him also. This 1/4 mile of trackage could use some TLC as there is debris all over the tracks and road bed.
|
|