Copper Basin Railway’s OT-1 ore shuttle train is in the middle of its copper ore dumping process at Asarco’s unloading facility at Hayden, Arizona, on April 20, 2017. The arriving CBRY OT-1 unloads the front half of the train and then stops, cuts the power off and runs around the unloading facility. After reversing back to their train, it then backs the entire train through the loader and then begins unloading the other half of the train. In this view, the power has run around its train and is now backing through the unloader building. It will then begin unloading what was the last half of OT-1.