The 18 Re 465 locomotives of the BLS, which were built between 1994 and 1997 by SLM and ABB, will undergo a revision/refit for the second half of their lifetime. Re 465 # 001 in the special paint scheme for 10 years Lötschberg Base Tunnel and # 004 in the "Kambly" paint scheme, running in multiple control, are entering Frutigen on a test run from Zweisimmen via Spiez.