An eastbound CN freight led by CN 2693 slows to a stop for a crew change under a modern CTC signal at the end of the siding at Rocky Run. Crews will change here, just west of Stevens Point, WI, and will wait for a couple freights to go by, then proceed with their train through Stevens Point to North Fond Du Lac Yard, the last stop before Chicago.