Sheltam # 3009 backs down the west leg of the triangle at Cooke 2 Shaft, to couple up to the empty hoppers placed there earlier in the morning by the night shift. The hoppers will be pushed through the loading tower, to be loaded with waste by front end loaders, from a stockpile next to the track.