The "Marblehead Local" based out of Burmester, UT has arrived at Delle on the former WP mainline. After pulling west the conductor alighted and lined the west switch of the wye. Here the local can be seen backing around the wye to begin it's 11 mile long shove out to the end of the Rowley Industrial Lead. Notice the old pole line with four white bands around it demarcating a milepost. Subsequent poles will have one, two or three stripes to denote 1/4, 1/2, and 3/4 mile markers respectively.