Valley Railroad No 3025s trailing truck is being readied to be placed under the locomotive int he railroad's Essex, CT shops. This was during the reubild project of the former Knox & Kane Chinese... (more)
Putting the cart before the horse, so to speak. The drivers have been placed in front of the Mikado in preperation for their placement under the locomotive during the rebuilding of Valley Railroa... (more)
Valley Railroad No. 3025 is temporarily a cab in front during it's restoration. Planning for steam-up this year!
The Valley Railroad's Chief Mechanical Officer, J. David Conrad, is performing the rarely seen "Ring of Fire" that will "sweat" off the tire of the Right No. 1 Driver belonging to the Valley's 2-8... (more)
Out of the ashes of the Knox & Kane fire, this rusty hulk is destined to rise like a phoenix and once again ride the rails. This Chinese-built SY locomotive, which was damaged in the engin... (more)